Featured builds & mobile vendor drawings

Direct from drafting boards and job site framing lines: residential general contracting, full-scope kitchen transformations, and turnkey food trailer CAD/MEP packages prepared for health & fire department submittals.

Index StatusLive Revision
Active Sets148+
Submittal Pass99.4%
CAD layout of a taco trailer kitchen with prep counters, fryers, and hood

Craft Taco Trailer

24ft Custom Tandem Axle Mobile Kitchen Unit

Completed residential addition with glulam beams and concrete patio

Hillside ADU Addition

Grade-beam foundation with 2-bed independent dwelling

Mechanical drawing of a mobile espresso trailer with plumbing and electrical

Artisan Roaster Mobile Cafe

18ft Double Espresso Bar + Potable Water System

Remodeled kitchen with green shaker cabinets and marble waterfall island

Craftsman Kitchen Remodel

Load-bearing wall removal & recessed steel girder install

CAD drawing of a smashburger trailer with ventilation hood and fire suppression

Iron Grill Smokehouse Trailer

Heavy grease extraction & 3-tank manifold configuration

Framing of a cantilevered second-story addition with Simpson Strong-Tie hardware

Second Story Cantilever

1,200 sq ft master suite expansion with seismic shear retrofitting

Transformation Benchmark // Visual Calibration

Before & after: raw chassis to permitted trailer

Slide horizontally to compare the stripped shell with the finished, health-department-approved food service rig.

After: finished food trailer with stainless steel equipment, exhaust hood, and triple sink After // Certified Turnkey Rig
Before: bare enclosed cargo trailer interior with exposed walls and wiring Before // Bare Enclosed Chassis
100% CAD Field Precision 0% Code Deficiencies
Project No: MHS-FT-1049 • Seattle WA
Standard Engineering Protocol

Permit package sheet register

Standard Drawing Set // 24" × 36" Arch D Sized
Sheet Drawing Discipline / Scope Scale Ratio Code Reference Delivery Stamp
T-01 Cover Sheet, Sheet Index & Vicinity Map N.T.S. IBC Sec. 107 CAD 2D/3D
A-101 Equipment Floor Plan & Clear Path Dimensions 1/4" = 1'-0" WAC 246-215 & ADA Health Dept
P-201 Plumbing Schematic, Potable Tank & Greywater Riser 3/8" = 1'-0" UPC Ch. 6/7 Riser Diagram
E-301 Electrical Single-Line Diagram & Panel Load Schedule Schematic NEC Art. 550 / 705 50A/100A Load
M-401 Type 1 Exhaust Hood, Duct Routing & Pro-Tex Fire Suppression 1/2" = 1'-0" NFPA 96 & IMC Sec. 507 Fire Marshal
All deliverable sets undergo pre-check review against local jurisdiction amendments. Turnaround Time: 7-10 Business Days

Ready to submit your project specs for review?

Send us your rough sketches, equipment cuts, or property parcel info. Our drafting desk will review zoning setbacks and fire department hood constraints, and deliver an exact plan set milestone schedule.

Zero Permit Defect Commitment Licensed General Contracting Team Full MEP Hood Integration
Express Spec Desk Call or send drawings

Plan intake open Monday through Friday, 7am – 5pm PST.

Submit Specifications Now Call: (425) 200-5315